Показати скорочений опис матеріалу
dc.contributor.author | Teremetskyi, Vladyslav | |
dc.contributor.author | Ustymenko, Volodymyr | |
dc.contributor.author | Bida, Kateryna | |
dc.contributor.author | Denysyuk, Petro | |
dc.contributor.author | Novytska, Nataliia | |
dc.contributor.author | Теремецький, Владислав Іванович | |
dc.date.accessioned | 2024-01-25T07:57:39Z | |
dc.date.available | 2024-01-25T07:57:39Z | |
dc.date.issued | 2022 | |
dc.identifier.citation | Ustymenko V., Teremetskyi V., Bida K., Denysyuk P., Novytska N. Experience of conclusion and performance of engineering, procurement and construction contracts in post-Soviet countries. Political Questions, 40(74), 830-848. https://doi.org/10.46398/cuestpol.4074.46 | uk_UA |
dc.identifier.issn | 0798-1406 | |
dc.identifier.uri | https://produccioncientificaluz.org/index.php/cuestiones/article/view/38952/43550 | |
dc.identifier.uri | https://repository.ndippp.gov.ua/handle/765432198/826 | |
dc.description | Основною метою статті є аналіз властивостей та ризиків, що виникають під час укладення та виконання контрактів на інжиніринг, закупівлю та будівництво (далі – EPC-контракти) в Україні, Казахстані, Росії та Білорусі, незважаючи на нинішню ситуацію з військовою агресією та санкціями. Методологічну основу дослідження складають порівняльно-правовий та структурно-логічний метод, системний аналіз та синтез. Також описано шляхи відповідної адаптації EPC-контрактів відповідно до вимог законодавства. Крім того, автори детально вивчили правові інструменти, які могли б допомогти договірним сторонам встановити контроль за виникненням ризиків у різних юрисдикціях пострадянського простору. Насамкінець було зроблено висновок, що застосування EPC-контрактів у країнах пострадянського простору пов’язане з наявністю високого рівня політичних ризиків, які слід враховувати при реалізації масштабних інфраструктурних проектів. Результати дослідження будуть корисними юристам-практикам, студентам та науковцям, які цікавляться вивченням суспільних відносин у сфері цивільних робіт з певним політичним впливом на розвиток цієї галузі. | uk_UA |
dc.description.abstract | The main purpose of the article is the analysis of properties and risks arising during the conclusion and performance of engineering, procurement and construction contracts (hereinafter referred to as EPC contracts) in Ukraine, Kazakhstan, Russia and Belarus, notwithstanding the current situation with military aggression and sanctions. The methodological basis of the study consists of the comparative legal and structural-logical method, systemic analysis and synthesis. It also describes the ways of relevant adaptation of EPC contracts in accordance with the requirements of the legislation. In addition, the authors have studied in detail the legal instruments that could help the contracting parties to establish the control due to occurrence of risks in different jurisdictions of the post-Soviet space. Finally, it was concluded that the application of EPC contracts, in the countries of the post-Soviet space, is connected with the presence of high level of political risks that should be taken into account when carrying out large-scale infrastructural projects. The results of the study will be useful to practicing lawyers, students and scientists who are interested in the examination of public relations in the field of civil works with some political influence on the development of this sector. | uk_UA |
dc.language.iso | en | uk_UA |
dc.publisher | Universidad del Zulia | uk_UA |
dc.relation.ispartofseries | Vol. 40 No. 74 (2022): Cuestiones Políticas; | |
dc.subject | contract enforcement | uk_UA |
dc.subject | capital construction | uk_UA |
dc.subject | contract law | uk_UA |
dc.subject | civil engineering | uk_UA |
dc.subject | post-Soviet countries | uk_UA |
dc.subject | забезпечення виконання контракту | uk_UA |
dc.subject | капітальне будівництво | uk_UA |
dc.subject | договірне право | uk_UA |
dc.subject | цивільне будівництво | uk_UA |
dc.subject | країни пострадянського простору | uk_UA |
dc.title | Experience of conclusion and performance of engineering, procurement and construction contracts in post-Soviet countries | uk_UA |
dc.title.alternative | Досвід укладання та виконання інжинірингових, закупівельних і будівельних контрактів у країнах пострадянського простору | uk_UA |
dc.type | Article | uk_UA |
dc.identifier.doi | https://doi.org/10.46398/cuestpol.4074.46 |